обучение гнвп
iwcf

IWCF Courses

IWCF Drilling Well Control. Surface BOP

IWCF Drilling Well Control. Combined BOP

IWCF Well Intervention Pressure Control

Training Centre

wadjet

The IWCF Certification

About IWCF Courses

IWCF Drilling Well Control. Surface BOP and Combined BOP

The Programmes are divided into levels

Level 2

Level 3

Level 4

Mandatory course components

Level 2

  • Principles and Procedures
  • Equipment

Level 3, 4

  • Principles and Procedures
  • Equipment
  • Practical examination on a simulator

IWCF Well Intervention Pressure Control

The Programmes are divided into levels

Level 2

Level 3

Level 4

Mandatory course components

  • Completion Equipment
  • Completion Operations

Optional Components

  • Wireline Operations
  • Coiled Tubing Operations
  • Snubbing Operations

Programme Objectives

Latest news

Schedule

You can enroll in the course at any time before it starts

Views Navigation

Event Views Navigation

This Month

Calendar of Events

M Mon

T Tue

W Wed

T Thu

F Fri

S Sat

S Sun

2 events,

Drilling Well Control. Surface BOP. Levels 3, 4, online (Russian) — Управление скважиной при бурении. Наземное ПВО. Уровни 2,онлайн (русский)

Drilling Well Control. Surface BOP. Levels 3, 4, online (English) — Управление скважиной при бурении. Наземное ПВО. Уровни 3, 4, онлайн (английский)

0 events,

2 events,

Drilling Well Control. Surface BOP. Levels 2, 3, 4, online (Russian) — Управление скважиной при бурении. Наземное ПВО. Уровни 2, 3, 4, онлайн (русский)

Well Intervention Pressure Control. Levels 2, 3, 4, online (Russian) — Управление давлением при внутрискважинных работах. Уровни 2, 3, 4, онлайн (русский)

0 events,

2 events,

Well Intervention Pressure Control. Levels 2, 3, 4. Almaty, Atyrau, Aktau, Aktobe, Astana/online (Russian)

Drilling Well Control. Surface BOP. Levels 2, 3, 4. Almaty, Atyrau, Aktau, Aktobe, Astana/online (Russian)

0 events,

2 events,

Well Intervention Pressure Control. Levels 2, 3, 4. Almaty, Atyrau, Aktau, Aktobe, Astana/online (Russian)

Drilling Well Control. Surface BOP. Levels 2, 3, 4. Almaty, Atyrau, Aktau, Aktobe, Astana/online (Russian)

0 events,

2 events,

Drilling Well Control. Surface BOP. Levels 2, 3, 4. Almaty, Atyrau, Aktau, Aktobe, Astana/online (Russian)

Well Intervention Pressure Control. Levels 2, 3, 4. Almaty, Atyrau, Aktau, Aktobe, Astana/online (Russian)

0 events,